A boater's guide to the Llangollen Canal

The Llangollen Canal leaves the Shropshire Union at Hurleston and crosses into Wales over Pontcysyllte Aqueduct, which the Canal & River Trust calls the tallest navigable aqueduct in Britain. This guide covers the route, both aqueducts, the boat sizes it takes, mooring rules and news of the breach that has shut the through route until 2027.

A narrowboat crossing a tall iron trough aqueduct on stone piers, a rocky river and misty woods far below.

In short. The Trust's boating page gives the canal 46 miles and 21 locks, and takes a boat up to 72 ft long and 6 ft 11 in wide. Its two great aqueducts, Chirk and Pontcysyllte, are at the Welsh end, and the stretch from Chirk to Horseshoe Falls is a UNESCO World Heritage Site. The through route has been shut since a breach near Whitchurch in December 2025, and the Trust expects to reopen it in March 2027. Read that part first if you are planning a trip.

The Llangollen Canal in figures

ItemFigure
Length46 miles on the Trust's boating page; 41 miles, from King's Bridge in Berwyn to Hurleston Locks, on its main page for the canal
Locks21
JoinsThe Shropshire Union Canal at Hurleston
Biggest boat72 ft long and 6 ft 11 in wide (21.95 m by 2.11 m)
Pontcysyllte Aqueduct1,007 ft long, 127 ft high, 18 arches, finished in 1805
Chirk Aqueduct710 ft (220 m) long, 70 ft above the River Ceiriog, 10 arches, finished in 1801
World Heritage SiteInscribed by UNESCO on 27 June 2009
Through routeClosed by the Whitchurch breach; reopening expected in March 2027

Where these come from: the Trust's pages on the canal, boating it, its walk to Pontcysyllte, Chirk Aqueduct, World Heritage status and the breach repairs, all read on 20 November 2026. The Trust's own pages give two lengths, so both are here.

The Whitchurch breach and the 2027 reopening

A drained canal channel between brick walls behind a steel dam, a narrowboat afloat beyond it
While the bank is rebuilt, dams hold the water back either side of the gap.

In December 2025 an embankment near Whitchurch gave way and the water ran out into a farmer's field. The Trust's breach updates tell the story: two boats, Sefton and Ganymede, were washed into the hole, and six more were left on the canal bed until dams let them float again. Its first report suggests the likely cause was an undetected, long-term leak deep beneath the canal bed, which wore away the ground under it.

On 6 November 2026 the Trust said it expects the canal to reopen in March 2027, ahead of Easter. The new embankment should be finished before Christmas, then a concrete channel is built in the new year, and it adds that progress depends on the weather. Boats on the far side are not stranded in a puddle: its breach FAQs, last edited on 13 April 2026, say about 69 km of water is still open across the canal, the Montgomery Canal and the Prees Branch. Being behind the breach does not earn a cheaper licence, it adds, because a licence fee does not guarantee navigation. Both read on 20 November 2026. If you are booking a week for spring 2027, check the stoppage notice again before you pay.

Where it runs

A narrowboat on a stretch of canal one boat wide, between a rock face and a stone wall high above a river valley
Near Llangollen the channel is often only wide enough for one boat.

From Hurleston to the hills

The canal leaves the Shropshire Union at Hurleston, which the Trust calls "a boat spotter's paradise", and heads west past Whitchurch and over the border into Wales. The Trust's main page says it runs through three of its regions: the North West, the West Midlands, and Wales & South West.

The narrow top end

West of Trevor the canal was built as a "navigable feeder", a channel to carry water from the River Dee to the rest of the canal. On its walk from Llangollen Wharf the Trust says the canal is "very narrow here, often only wide enough for one boat". It also has a current. The same walk says the canal "unusually has a flow of 2mph as it feeds water to other canals", and the Trust's safety advice warns that boats travelling downstream "will be carried along the water faster than travelling upstream". Take the narrow bends slowly and look well ahead. For the basics at the tiller, see how to steer a narrowboat.

Two aqueducts and two tunnels

A low arched stone aqueduct with a narrowboat on it, a taller arched viaduct just behind, above a wooded river
A stone aqueduct with a railway viaduct close behind it.

The Trust's safety advice for the aqueduct says the 11-mile World Heritage stretch includes two aqueducts, at Pontcysyllte and Chirk, and two tunnels, at Chirk and Whitehouse.

Chirk

Chirk Aqueduct was finished in 1801 by William Jessop and Thomas Telford, the Trust says. It is 710 ft (220 m) long and carries the canal 70 ft above the River Ceiriog on 10 masonry arches, with a viaduct beside it. It straddles the border, so you can stand with one foot in England and one in Wales. Just along the towpath is Chirk Tunnel, known locally as "The Darkie", which the Trust calls one of the first in the UK to have a towpath. Its main page describes it as "short but surprisingly dark". Put the headlight on.

Pontcysyllte

The Trust spells out how to say it, "Pont-ker-sulth-teh", and calls it "Ponty". Its walk guide gives it as 1,007 ft long and 127 ft high on 18 arches, and calls it the longest and highest aqueduct in the UK. Its history page says it took more than ten years to build, with the final stone laid in 1805 at a cost of £38,499. UNESCO calls it "the first great masterpiece of the civil engineer Thomas Telford", made "using metal arches supported by high, slender masonry piers". UNESCO adds that both cast and wrought iron went into it. The Trust's safety advice warns that it "has no protective railing on the canal side", and its walk guide puts it plainly: boaters steer "with sheer drops without even railings on their side".

Crossing it by boat

For boats the aqueduct is a one-way system, the Trust's safety advice says, and nobody has right of way. Give way to boats already on it or waiting at the far end, and use the moorings at either end while you wait your turn. Don't stop in the middle for photographs when it's busy, and don't lean over the side of the boat. That safety advice was read on 20 November 2026.

Horseshoe Falls, where the water starts

A long curved weir across a rocky river in an autumn valley, a stone hut and a walled channel at one end
Every drop in the canal starts at a weir on the River Dee.

At Llantysilio, above Llangollen, the canal begins at a weir across the River Dee. The Trust's Horseshoe Falls walk calls the 140 m semi-circular weir "Thomas Telford's dramatic finale", and says about 12 million gallons of water a day flow from here all the way to Hurleston Reservoir. Its main page says the canal's water comes "almost entirely" from the Dee at this point, and that it still feeds the northern Montgomery Canal and the Shropshire Union. Some of it ends up as drinking water, treated by United Utilities. The walk from Llangollen Wharf to the falls is two miles, and the wharf runs horse-drawn boat trips along the canal.

A canal that was never the plan

The Ellesmere Canal Act of 1793 planned a trunk route from the Mersey to the Severn at Shrewsbury, the Trust's history page says. The money ran out. The Chester and Shrewsbury lines were dropped, the branch towards Whitchurch was carried on to meet the Chester Canal at Hurleston, and the feeder was built out to the Dee. Traffic stopped in the 1930s. An Act of Parliament closed the canal in 1944, though a second Act kept it open ten more years to supply water to industry. Water saved it in the end: a manager agreed with the water company serving south Cheshire that it would take its supply from the Dee through the canal. By 1959, when that began, the canal was becoming popular with holidaymakers.

Planning a trip

Narrowboats moored bow to stern along a misty towpath, a bicycle leaning on a post
Visitor moorings are signed with a time limit; read the sign before you tie up.

Will your boat fit?

StretchLengthBeamDraughtHeadroom
Hurleston to Pontcysyllte72 ft (21.95 m)6 ft 11 in (2.11 m)2 ft 6 in (0.76 m)7 ft (2.12 m)
Pontcysyllte to Llangollen72 ft (21.95 m)6 ft 11 in (2.11 m)2 ft 5 in (0.75 m)7 ft (2.13 m)

The Trust's waterway dimensions page marks Hurleston as the pinch point (read on 20 November 2026). A beam limit of 2.11 m is narrowboat size, so a wide beam will not fit; our wide beam guide covers where wider boats can go. The draught limit is shallower than anywhere on the Grand Union (how deep is a canal has the reasons), and will my boat fit checks your own figures.

Mooring

The Trust's short-stay moorings page says visitor moorings are signed for 4 hours, 48 hours, 7 days or 14 days, and are free for the time on the sign. Stay longer and you may pay a £25 extended stay charge for each extra day. From 1 November to 31 March some become winter moorings, but in popular places the limit holds all year (read on 20 November 2026). The Trust's walk guide describes Llangollen Basin as "popular with visiting boats", and waiting boats use the moorings at each end of Pontcysyllte.

The bow of a green narrowboat nosing between open lock gates, a stone lock cottage behind
Count the locks as well as the miles when you time the trip.

Licence, closures and time

Any boat on the Trust's water needs a licence, engine or no engine, its licensing page says (read on 20 November 2026), and our licence cost guide has the fees. Look at the Trust's notices and stoppages list before you set off, for the breach and anything else. To work out how long the 21 locks and the miles will take, use our cruise time planner, and see where the canal sits on the UK canal map. If you're on a hire boat, pack with our canal boat holiday tips. Other canals: the Grand Union Canal guide and English canal maps.

If her canal is the Llangollen

Boaters who know this canal tend to talk about it by name. Our personalised narrowboat name print sets her name in big letters and puts the canal and a year underneath, and the year she first crossed Pontcysyllte would be a good one to choose. For more ideas, browse our canal boat gifts.

Questions before you go

Is the Llangollen Canal open?

Not all the way through. A breach near Whitchurch in December 2025 closed the through route, and on 6 November 2026 the Trust said it expects to reopen it in March 2027. Its breach FAQs, last edited 13 April 2026, say about 69 km stays navigable beyond the breach. Check the Trust's notices and stoppages page before you travel.

How long is the Llangollen Canal?

The Canal & River Trust's boating page gives 46 miles and 21 locks. Its main page for the canal gives 41 miles, from King's Bridge in Berwyn to Hurleston Locks, where it meets the Shropshire Union Canal.

Can you take a narrowboat over Pontcysyllte Aqueduct?

Yes. The Trust runs it as a one-way system with no right of way: give way to boats already on it or waiting first, and wait your turn at the moorings at either end. It has no protective railing on the canal side, so don't lean over.

How big a boat fits?

The Trust's limits are 72 ft (21.95 m) long and 6 ft 11 in (2.11 m) wide, with a draught of 0.76 m from Hurleston to Pontcysyllte and 0.75 m on to Llangollen. A wide beam will not fit.

Where does the canal's water come from?

Almost entirely from the River Dee at Horseshoe Falls, Llantysilio, the Trust says. Its walk guide puts the flow at about 12 million gallons a day, all the way to Hurleston Reservoir.

When did Pontcysyllte Aqueduct become a World Heritage Site?